CASE STUDY

Mughalsarai Railway Station (Pt. Deen Dayal Upadhyaya Jn.)

Uttar PradeshCompleted: In Progress

Project Stats

750+PILES DRIVEN
30mAVERAGE DEPTH
6MONTHS DURATION
ZeroINCIDENTS

Project Scope & Objective

Executing deep foundation works for the expansion and modernization of the historic Pt. Deen Dayal Upadhyaya Jn. (Mughalsarai) railway station, ensuring high load-bearing capacity for new transit infrastructure.

We were contracted to design, execute, and monitor the entire deep foundation phase. This involved rigorous pre-construction geotechnical analysis, the deployment of advanced rotary drilling rigs, and precise installation of high-capacity reinforced concrete piles.

ENGINEERING PRECISION

Technical Challenges & Solutions

Live Railway Traffic

Operating heavy rotary rigs safely within an active railway environment.

Complex Logistics

Coordinating material movement through high-density passenger areas.

Soil Stabilization

Implementing specialized grouting to stabilize soils near active tracks.

Technical Challenge in action
Phase 2: Active Drilling

Engineered for your next
major project.

Bring structural integrity and unmatched precision to your development. Our technical team is ready to review your specifications.

Get a Free Quote