CASE STUDY

Darbhanga DMCH

Darbhanga, BiharCompleted: In Progress

Project Stats

400+PILES DRIVEN
18mAVERAGE DEPTH
5MONTHS DURATION
ZeroINCIDENTS

Project Scope & Objective

Collaborating with NCC to deliver reliable and robust deep foundation solutions for the expansion and modernization of Darbhanga Medical College and Hospital (DMCH), ensuring structural integrity for the new medical facilities.

We were contracted to design, execute, and monitor the entire deep foundation phase. This involved rigorous pre-construction geotechnical analysis, the deployment of advanced rotary drilling rigs, and precise installation of high-capacity reinforced concrete piles.

ENGINEERING PRECISION

Technical Challenges & Solutions

Hospital Operations

Minimizing noise and vibration to ensure uninterrupted operations of the existing medical facilities.

Restricted Site Access

Navigating heavy piling machinery through constrained hospital access routes.

Stringent Quality Control

Adhering to strict structural standards required for critical healthcare infrastructure.

Technical Challenge in action
Phase 2: Active Drilling

Engineered for your next
major project.

Bring structural integrity and unmatched precision to your development. Our technical team is ready to review your specifications.

Get a Free Quote