CASE STUDY

Bihar Museum

Patna, BiharCompleted: Q4 2023

Project Stats

600+PILES DRIVEN
25mAVERAGE DEPTH
7MONTHS DURATION
ZeroINCIDENTS

Project Scope & Objective

The Bihar Museum project, spearheaded by L&T, required a highly specialized foundation strategy capable of supporting complex architectural structures across a sprawling campus. We were contracted to design and execute the complete deep foundation phase, ensuring the structural integrity of this landmark institution.

We were contracted to design, execute, and monitor the entire deep foundation phase. This involved rigorous pre-construction geotechnical analysis, the deployment of advanced rotary drilling rigs, and precise installation of high-capacity reinforced concrete piles.

ENGINEERING PRECISION

Technical Challenges & Solutions

Variable Soil Stratigraphy

Navigating inconsistent soil layers required adaptive drilling techniques and real-time sonic logging.

Vibration Mitigation

Operating near existing historic structures necessitated advanced oscillator casing systems to minimize vibration.

Tight Timeline

Implemented a 24/7 operational schedule with overlapping drilling phases to meet L&T's aggressive timeline.

Technical Challenge in action
Phase 2: Active Drilling