CASE STUDY

Bapu Tower

Patna, BiharCompleted: Q1 2024

Project Stats

425+PILES DRIVEN
25mAVERAGE DEPTH
5MONTHS DURATION
ZeroINCIDENTS

Project Scope & Objective

Bapu Tower stands as a monumental tribute in Patna. The project required a foundational system capable of supporting a high-rise structure within a highly constrained urban footprint. Our team deployed high-capacity rotary drilling rigs for the precise installation of reinforced concrete piles.

We were contracted to design, execute, and monitor the entire deep foundation phase. This involved rigorous pre-construction geotechnical analysis, the deployment of advanced rotary drilling rigs, and precise installation of high-capacity reinforced concrete piles.

ENGINEERING PRECISION

Technical Challenges & Solutions

Constrained Urban Footprint

Limited site access required meticulous logistics planning for heavy machinery and material delivery.

High Load-Bearing Requirements

The monumental scale of the tower necessitated ultra-deep piles exceeding 40 meters.

Urban Noise Regulations

Adhered to strict municipal noise ordinances by utilizing specialized acoustic enclosures for our rigs.

Technical Challenge in action
Phase 2: Active Drilling

Engineered for your next
major project.

Bring structural integrity and unmatched precision to your development. Our technical team is ready to review your specifications.

Get a Free Quote